Installation of a Skysteam 3.7™ in Susquehanna County, PA

Installation of the Skystream by Trehab Renewable Energy (TRE) is a three visit process. After many of the details have been discussed via phone, email, and office visits – we will come out and do an on-site assessment to verify and solidify the details. It is at this visit that the site is flagged for the contractor and the contract is signed.

On the second visit, the contractor digs the foundation and the trenching for the wiring. The foundation anchor (bolts and rebar) are assembled and concrete is poured. On that same visit, the electrician lays the conduit in the trench and runs the wires from the house to the foundation. The contractor then refills the trench with dirt before leaving the site.

On the third visit, the Skystream™ turbine and blades are assembled. The electrician completes the connections from the Skystream™ to the breaker box. Depending on the size of the tower, either a hinge-plate or a crane is used to set the tower on the foundation anchor. The contractor removes any excess dirt and gently landscapes any rough areas.

Sit back and enjoy watching your Skystream™ in action!! If you have any questions, please contact us.

See the Installation Process:



Trehab Renewable Energy, 10 Public Ave., PO Box 366, Montrose, PA 18801 (570) 278-5279

Home | Contact Us | About Us

Web design: Martin Works, Inc.